Stability Engineering – Structural Engineering Services

Bridge To Grace

About the Project
Stability engineered this 40-ton capacity, steel bridge spanning 36 ft over Honey Creek to access the cemetery associated with the Monastery of the Holy Spirit. The bridge replaces an older bridge which was often unusable due to low load capacity and flooding. The new bridge has a concrete deck, wing walls, and an elevated approach.
Contractor: Bridges to the Other Side