Stability Engineering is honored to be working with the PATH Foundation and the City of Newnan on the LINC trail system, a 12-foot-wide paved path built on public rights of way and greenspace that will create an eventual 26-mile network of paths. As the structural engineer of record, we provided design for the bridge bents, abutments and retaining walls, as well as coordination and review of the 200 ft clear span (total length 275 ft) prefabricated steel bridge structure over I-85, all part of the first phase of the project, which totals 1.4 miles.