Stability Engineering – Structural Engineering Services

South Peachtree Path

About the Project
Stability Engineering provided design services for the construction of a segment of the South Peachtree Creek trail that, once completed, will link Emory University to Mason Mill Park, Medlock Park, and many of the surrounding neighborhoods in the Druid Hills and North Decatur areas. This trail segment includes a 40’ steel bridge that spans over a tributary of the South Peachtree Creek, as well as a timber framed boardwalk that was implemented with a top-down construction technique. Top-down boardwalk construction aims to minimize impact and disturbance on vulnerable wetlands, and accelerate build times.