Greenbelt Hays Mill, Phases 11 & 12

The Greenbelt Hays Mill is a portion of the Carrollton Greenbelt, a 16-mile trail system designed for pedestrians and non-motorized uses. Once complete, it will connect neighborhoods with the city school campus, the University of West Georgia, city parks, and commercial areas.

For Phase 11, structural elements included a concrete abutment wall design for a pre-engineered steel bridge and wood framed boardwalks crossing drainage ditches. For Phase 12, we provided details for (1) a boardwalk through wetlands and small drainage ditches, (2) concrete abutment walls on helical piers to support a prefabricated steel bridge, and (3) concrete retaining walls for an existing culvert.



Georgia and West: www.GeorgiaandWest.com

 

Return to the Civic / Landscape Portfolio